Drilling on Tight Urban Sites Across Toronto and the GTA

A downtown investigation is a different job to a greenfield one. Access, headroom, noise, and utilities all constrain what is possible — and most of that can be worked out before mobilization. Drilling on an open field is straightforward. Drilling in downtown Toronto, in a parking garage, inside an operating building, or in a laneway […]
What Actually Happens During a Phase Two ESA Drilling Program

A Phase One Environmental Site Assessment is a paper and walk-through exercise. It reviews the history of a property, past uses, aerial photographs, and site records, and it identifies areas of potential environmental concern. What it cannot do is tell you what is actually in the ground. That is the job of the Phase Two […]